Every migration project starts with a plan and a deadline. Most of the real problems show up somewhere in between.


Bad data goes in, bad data comes out

A migration does not fix bad data. It moves it. Duplicate customer records, blank fields, inconsistent formats, old entries nobody ever cleaned up, all of that comes along unless someone deals with it first. Teams often plan to handle this during the move itself, but that is usually the worst time to try. The safer, cheaper point to clean up data is before the migration starts, not after go-live when the new system is already live and people are relying on it.

Nobody owns the cleanup

Data quality sits in a strange spot on most projects. IT owns the system. Finance owns some of the numbers. Operations owns how the data gets used day to day. The vendor running the migration owns getting it from point A to point B. With that many hands involved, it is easy for everyone to assume someone else is checking the data, and for nobody to actually do it. The result is usually that everything gets migrated by default, including records that should have been left behind.

The timeline is always too short

Go-live dates tend to get set early, often before anyone has looked closely at how much data there actually is or what shape it is in. Once the deadline is fixed, it stops moving, even as the real scope of the work becomes clear. That is when shortcuts start. Validation steps get reduced. Old historical records that should have gone into a separate archive get pulled into the live migration instead, because there is no time left to sort them properly. The deadline gets met, but the system inherits problems that were supposed to be filtered out.

Testing gets skipped under pressure

A full test migration, run against real data before the actual cutover, is one of the most useful things a project can do. It is also one of the first things to get cut when time runs short. Skipping it means the first time anyone sees how the data actually behaves in the new system is during the real migration, when there is no room left to fix what goes wrong.

Our perspective

Most of these problems trace back to one decision that never got made clearly: what actually needs to move into the new system, what should be archived separately, and what can be left behind entirely. Getting that sorted out before the migration starts is a smaller task than fixing it afterward. If SAP or OpenText data is part of what you are migrating, our free SAP and OpenText data archiving and decommissioning assessment can help you figure out what you are actually dealing with, with no commitment attached.