The question worth asking before any S/4HANA project kicks off is not "how do we migrate everything." It is "what actually needs to come with us."


The default is to bring everything, and that is the problem

Most migration scoping starts from the existing ECC system and works forward: here is what we have, let's move it. That instinct is understandable. It feels safer than leaving something behind. But it also means every dormant customer record, every closed project, every document attachment nobody has opened in years comes along for the ride, gets tested, gets validated, and ends up sitting in the new system taking up the same space it did in the old one.

A smaller, deliberate data set is not a shortcut. It is usually the more careful option, because someone actually looked at what was there before deciding.

What belongs on the checklist

Closed financial periods. Once a fiscal year is closed and audited, the detailed transactional data behind it rarely needs to be live and queryable in the production system. It needs to be retrievable for audit and statutory retention, not sitting in the same tables you query every day.

Master data nobody maintains anymore. Vendors you stopped ordering from years ago, customers with no activity, materials that were discontinued and never cleaned out. These records were often created once, under time pressure, and never revisited. Carrying them across just moves the clutter.

Completed projects and old work orders. Historical project data has reference value, but it rarely needs the same real-time structure a live project does. It can usually be archived in a form that is searchable without needing to behave like an active record.

Superseded documents and attachments. Old versions of contracts, specs, and correspondence that were replaced long ago. They add up in storage and in migration testing time without adding anything to how the business runs today.

Change logs and system-generated history beyond what compliance requires. Some of this has to be kept. Much of it is kept by default because nobody set a retention rule and decided otherwise.

Why this list is worth the effort before, not after

Every item left off this list is one less thing to map, test, and validate during cutover. It is also one less thing that can go wrong on go-live weekend. Migration timelines get tight not because the live, actively used data is hard to move. They get tight because the long tail of old, low-value data takes almost as much testing effort as the data that actually matters, and there is a lot more of it.

The other benefit shows up later. A smaller S/4HANA footprint is cheaper to run. Less data to back up, less data to search through, less data in scope the next time an audit or a system upgrade comes around.

This is an archiving and retention decision, not a deletion decision

None of this is about throwing data away. Statutory retention requirements, audit trails, and anything with real legal or historical value still need to be kept, just not necessarily inside the live transactional system. Archiving that data separately, with a clear retention policy and a way to retrieve it when needed, is what actually shrinks the migration without creating a compliance gap.

Our perspective

The hardest part of this exercise is rarely the technical archiving work. It is getting a straight answer, early, on what is actually still needed. That conversation is worth having before a migration timeline gets fixed, not after. If you are planning a move to S/4HANA and want a clear-eyed look at what in your current SAP and OpenText environment should move, archive, or retire, our free SAP and OpenText data archiving and decommissioning assessment is built for exactly that question, with no commitment attached.